The program is proposed for a 5-years period. Indeed, some projects ought to be started as soon as possible.

In order to improve clarity, allow for partial funding and launch the program components, the budget is divided into 4 parts A, B, C, D (corresponding to the 4 expected outputs).

Please note: EXPENDITURES NECESSARY FOR MANAGING THE PROJECTS.ARE INCLUDED IN BUDGETS A, B, C and D.

A fifth table E, shows expenses relative to INBO proper. These expenditures are taken into account in the Network yearly budget. The General Assembly in Krakow (end of September 2000) must approved this budget together with the new statutes and vote the corresponding budget.

As regards this associated program, expenditures are divided into two categories:

  1. the financing of members' meetings during such and such project (direct cooperation actions for instance). This mainly generates travel costs and per diems;
  2. the funding of studies and training costs, i.e. intellectual services generating fees in man/day or man/month,

Note: Budget D of the "AQUADOC INTERNATIONAL" project also includes other kinds of expenditure.

Therefore, some expenses are repetitive and can be presented in "modules" usable according to the development of each item of each program budget. The following unit costs could be adopted:

All these figures can be discussed and shall vary depending on the case. Each project item will be followed up by one of the program partners (INBO, or LANBO, or CEE-TAC, or SAS-TAC, etc.) according to its capacity in gathering the financial resources required. For instance, the cost of a training program organized by CEE-TAC within the framework of Output n° 3 (Synthesis of knowledge and know-how) could differ from the cost of the same program organized by LANBO.

All figures are in 1,000 US dollars

 

 

Module n°1 Hypothesis :

round trips (including national travels) estimated at 1,525 US $/ capita

sojourn (8 days) on the average 1,220 US$/ capita,

total 2,745 proposed round figure 3,000US $ / capita.

Module n°2 Hypothesis : an average budget for professional workshop with coordinator and specialist is :

preparation, state of the art : 30,000 US $

training fees : : 15,000

translation : : 4,000

logistics (10%) : : 2,000

travel & sojourn of 15 attendees : 41,175

idem pour 2 coordinators : 5,490

TOTAL: 97,665 proposed round figure: 100.000 US $

Module n°2 bis: an average mission could include :

fees 12 daysx555 US $ : 6.660

travel and sojourns . : 2.745

TOTAL : 9.405 proposed round figure: 10.000US $/u

Module n°3: average budget

training fees: : 29,000 US $

translation : : 4,000

logistics (10%) : : 2,000

travel of local attendees : : 00

sojourn of local attendees (15x5j) : 11,434

travel & sojourn of coordinator (3u.) : 8,235

TOTAL : 54,669 proposed round figure: 55,000 US $/u

Module n°4: Hypothesis : An average budget to improve a river basin include:

Due to the experience in the following case : Aegean rivers (TURKEY), Sabarmati river (GUJARAT, INDIA), Rio San Juan & Rio Coco(NICARAGUA, HONDURAS & COSTA RICA), Irtysch river (KAZAKHSTAN), Vistula river (POLAND, UKRAINE, BIELORUSSIA), total cost can be comprise between US $ 320,000 (Irtysch) and 1,200,000 (Vistule) on a 3 years period, plus 10% of local costs borne by the beneficiaries.

For the purpose of the project, we propose to retain US $ 600,000, that is to say US $ 200,000/year.

 

 

- A -

 

ASSOCIATED PROGRAM BUDGET

OUTPUT N°1

Twinning arrangements for Direct Cooperation (d.c)

between basin organizations

 

Associated Program Actions

Year 1

2001

Year 2

2002

Year 3

2003

Year 4

2004

Year 5

2005

TOTAL

Desk study and first experience

(for the record-f.r.)

f.r.

0

0

 

 

 

 

(1) Meetings of resource persons

(3 persons maximum per partner) on mutual visits (see module n° 1)

 

 

2 d.c (*)

18

4 d.c

(*)

72

6 d.c

(*)

108

10 d.c

(*)

180

 

(2) Organization of a mutual workshop

10 local participants plus INBO coordinator (see. Module n°2)

 

2 d.c

200

4 d.c

400

6 d.c

600

10 d.c

1.000

 

(3) Project management by INBO coordinator

79

79

117

123

137

 

(4) Translation

lump sum

 

 

8

16

24

40

 

(5) Secretariat and miscellaneous

(f.r. to be supported by twin organizations)

 

(6) Visits of the coordinator and experts

(combined whenever possible with those planned in output n°2)

 

(7) Training courses

(when necessary combined, if possible, with those planned in output n°3)

 

SUB-TOTAL IN 1,000 US $ OUTPUT n°1

 

 

 

 

 

 

 

 

 

 

 

 

(*) ASUMPTIONS :

Year 1: one DC initiated by SAMTAC, plus one initiated by SASTAC = 2 DC

Year 2: plus one by CEETAC, plus one by SASTAC = 4 DC

Year 3: plus one by SAMTAC, plus one by SASTAC = 6 DC

Year 4: plus one of each regional networks = 10 DC

 

 

ESTIMATE COST FOR DIRECT COOPERATION

Direct Cooperation between two partners may generate the following costs:

Task description

Unit cost

US $

  1. Formation of a team with three resource persons maximum, in charge of establishing contacts locally, their salaries being borne by each partner, which represents part of its funding share. These people should meet at least once a year at each partner's headquarters, which implies the travel cost of twice 3 persons only as the host organization has not to pay travel cost and per diem for its own personnel (see details in module n° 1)

 

 

 

16,500/year/u

  1. Direct cooperation should include a common workshop once a year, gathering about ten local people and five visiting advisors to allow a wider exchange and the dissemination of acquired experience on topics carefully prepared in advance under INBO coordinator's responsibility (see details in module n° 2).

 

 

 

100,000/year/u

  1. Management cost for this project associated program, is usually computed by dividing by six the cost of INBO coordinator for a mean year (details in table E).

 

23,000/year/u

  1. Translation cost; (assumption)

4,000/year/u

  1. The cost of local secretariats are mentioned for the record as it is borne by each partner, this cost being part of its funding share.

 

 

f.r.

  1. Expenses generated by the visits and supervision of the coordinator and possibly specialists are mentioned for the record as they are already integrated in Output n° 2 for good management practice: the coordinator can effectively combined the travels needed for these two tasks.

 

 

f.r.

  1. It is the same regarding training costs which could be deemed necessary for good implementation of direct cooperation.

 

f.r.

   

TOTAL YEARLY ESTIMATE COST FOR COOPERATION

143,500/year/unit

   

 

 

- B -

 

ASSOCIATED PROGRAM BUDGET

OUTPUT N°2

Professional support to basin organizations

 

Associated Program Actions

Year 1

2001

Year 2

2002

Year 3

2003

Year 4

2004

Year 5

2005

 

TOTAL

Prof. Workshops with coordinator and specialist, and 15 attendees / twinning

(see module n°2)

 

2 unit

200

4 u.

400

6 u.

600

10 u.

1,000

 

External technical assistance for project evaluation, design and implementation (module n°2 bis)

1 u.

10

2 u.

20

"

20

4 u.

40

"

40

 

Action program for improvement of integrated water resources management with a basin organization : assumption 2 new BO/year, and 3 years of funding.

(see module n°4)

2 unit

 

400

2+2 u

 

800

4+2 u

 

1,200

4+2 u

 

1,200

4+2 u

 

1,200

 

Work visit of ISW coordinator for professional meeting with 15 RBO attendees on users' participation

 

200

 

200

 

200

 

200

 

200

 

ISW external technical assistance for implementation of users' participation expertise within RBOs

 

20

 

40

 

20

 

20

 

20

 

 

           

SUB-total IN 1,000 US $

OUTPUT n°2

           

 

(*) ASUMPTIONS :

Year 1: one BO initiated by SAMTAC, plus one initiated by SASTAC = 2 BO

Year 2: plus one by CEETAC, plus one by SASTAC = 4 BO

Year 3: plus one by SAMTAC, plus one by SASTAC = 6 BO

Year 4: minus 2, plus one of each regional networks = 6 BO

Etc.

 

 

- C -

 

ASSOCIATED PROGRAM BUDGET

OUTPUT N°3

Synthesis of existing knowledge and know-how

 

Associated Program Actions

Year 1

2001

Year 2

2002

Year 3

2003

Year 4

2004

Year 5

2005

 

TOTAL

SAMTAC prop. To be completed

           

CEETAC prop. To be completed

           

SASTAC prop. To be completed

           

RBA TU DELFT proposal

To be completed

           

Other proposal

           

 

ISW : enhancing knowledge base & capacity building training modules on land uses mapping

(see module n°3)

 

 

55

   

 

 

 

55

   

ISW : idem on conflict prevention & resolution

55

55

 

55

55

 

ISW : idem on users' education on water savings & IWRM

 

 

 

110

55

     

ISW : idem on willingness & capacity to pay

   

55

 

55

 

Training courses :

enhancing knowledge base & capacity building training modules for new coming partners (see module n° 3)

1 u.

 

55

2 u.

 

110

 

 

 

110

4 u.

 

220

 

 

 

220

 

SUB-total IN 1,000 US $

OUTPUT n°3

           

 

 

 

- D -

 

 

ASSOCIATED PROGRAM BUDGET

OUTPUT N°4

Networking of water documentation centers:

" AQUADOC-INTERNATIONAL "

 

Associated Program Actions

Year 1

2001

Year 2

2002

Year 3

2003

Year 4

2004

Year 5

2005

 

TOTAL

l CENTRAL EUROPE

Poland, Czech Rep.,Romania, Hungary)

  1. European network architecture
  2. tools, amenities
  3. multilingual research & works
  4. methodology (procedures, organization, format designing)
  5. technical assistance to NRDCs

budget does not include focal points equipment and operating costs

 

 

 

 

43

25

67

30

 

30

 

 

 

 

25

36

30

49

 

43

 

 

 

 

18

43

31

25

 

24

 

 

 

 

to be completed

 

SUB-TOTAL EUROPE

195

183

141

 

 

 

l SOUTH ASIA

(assumption 6 countries)

  1. Network architecture
  1. tools, amenities
  2. multilingual research & works
  3. methodology (procedures, organization, format designing)
  4. technical assistance to NRDCs

budget does not include focal points equipment and operating costs

 

 

 

64

36

101

46

46

 

 

 

36

55

46

73

64

 

 

 

 

28

64

46

36

91

 

 

to be completed

 

SUB-TOTAL SOUTH ASIA

293

274

265

 

 

 

l LATINO AMERICA

Brazil, Colombia, Mexico, Peru, Ecuador, Argentina,

To be completed

         

SUB-total IN 1,000 US $

OUTPUT n°4

     

 

To be completed

 

 

- E -

 

 

ASSOCIATED PROGRAM BUDGET

Associated Program coordination and management

 

Associated Program Actions

Year 1

2001

Year 2

2002

Year 3

2003

Year 4

2004

Year 5

2005

 

TOTAL

I – At the international level

INBO Permanent Technical Secretariat

           

l INBO general coordination

of associated program

30

30

30

30

30

 

l INBO drive & promotion,

general information of members & administrative management

 

 

6.5

 

 

6.5

 

 

7.0

 

 

7.0

 

 

7.0

 

 

34.0

l INBO General Assemblies 1 GA/24 months

--

32.0

--

35.0

--

67.0

l Liaison Bureau

2 meetings/18 months

35.0

17.5

35.0

17.5

35.0

140.0

l Assistance to regional networks

40.0

40.0

40.0

40.0

40.0

200.0

l Associated Program coordination and management

30.0

30.0

30.0

30.0

30.0

150.0

l Publication of "The Network Newsletter"

2 x 11.000 cop. / 18 months

60.0

30.0

60.0

30.0

60.0

240.0

 

l INBO Internet Site

INBO + RBO-AP/GWP

 

15.0

 

15.0

 

15.0

 

20.0

 

20.0

 

85.0

SUB-TOTAL IN 1,000 US $

INBO-Permanent Technical Sec.

 

216,5

 

201,0

 

217,0

 

209,5

 

222,0

 

1.066,0

 

 

- F -

 

 

ASSOCIATED PROGRAM BUDGET

Synthesis and financing over five years

 

 

Financing

 

Associated Program

Actions

ICA1)

BCA(2)

INBO

subscriptions

Country and member organizations contribution

 

TOTAL

OUTPUT N° 1

Twinning arrangements

         

 

OUTPUT N° 2

Professional assistance

         

 

OUTPUT N° 3

Synthesis of knowledge

         

 

OUTPUT N° 4

Documentation systems

         

 

Associated Program coordination

         

 

GRAND TOTAL